First two ceiling panels in place, September 26th, 2012


Control Room ceiling panels in the shop, September 23rd, 2012










Ghost stand in the shop, October 18th, 2011


June 26th, 2010


June 26th, 2010


Finally, a floor and new rack install, June 22nd, 2010


January 3rd, 2010


December 29th, 2009


May 1st, 2009


May 1st, 2009


May 1st, 2009


April 11, 2009


Studio A, April 11, 2009


In wall HVAC noise filtration systems in Studio A, April 11, 2009


Lead Engineer Steve Cunningham performing room calibration, September 13, 2008


Center wall is two separate walls with 2" air gap and 1/2" concrete layer, August 28, 2008


Studio A doors, August 28, 2008


Under floor cable management in Control Room, August 28, 2008


Under floor vacuum in Control Room, August 28, 2008


13 chamber tuned bass ports in Control Room floor, August 6, 2008